The Groundwork

Meet Daniel Livsey, Associate Engineer in our Brisbane Office

Daniel has experience across mining, government and research environments in Australia and the United States, supporting mine-water management, closure plannings, landform rehabilitation and infrastructure risk assessment. Daniel joined us in January of 2026 and has brought along his extensive knowledge to our team.

Where were you working before joining us at ATC Williams?

My first job was a Postdoc in Science and Policy, focused on water management issues, in the US National Oceanographic Atmospheric Administration, California. I then moved to the US Geological Survey (USGS) in California, and they asked if I could work on quantifying uncertainty in some of their measurements. We found that the agency’s current practise was overestimating the amount of uncertainty in their measurements due to incorrect calculations. I proposed a correction to their methods, which reduced the uncertainty in those measurements.

The measurements were important because they were being reported to a wetland’s restoration project in the San Francisco Bay. They wanted to capture how much sediment they would have for marsh accretion with the sea level rise to ensure the marshes wouldn’t drown.

What brought you to Australia?

We decided to move together as a family in 2020, as my father was in Australia working for CSIRO and we ended up really liking it here.

I got a job with the Department of Environment and Science in Queensland (DETSI), measuring the sediment loads going to the Great Barrier Reef, which was similar to work I was doing with USGS and the wetlands restoration project. They were using various methods and wanted to create methods that were more uniform so they could compare measurements across different rivers and time

Daniel working in the reef region.

Tell me about the development of the new National Hydrometric Monitoring Guidelines.

The guidelines are part of a series covering 12 aspects of hydrometric measurement to ensure measurements are consistent, defendable and accurate. We developed the guidelines for the use of acoustic instruments to measure both the quantity of water and the concentration of sediment. When you multiply sediment concentration by the flow, you can determine the mass of sediment passing a particular location over time.

The proposal came from the Department of Natural Resources, who were interested in using their existing acoustic instruments that measure flow, for measuring sediment transport and sediment load. Sediment loads are greatly important to areas such as the Barrier Reef, because excess sediment transport is a vector for pollutant transport that reduces viable light and decreases the health of the reef. So, we applied for an advanced Queensland Industry Research Fellowship and presented our project to the Hydrometric Committee. I was the representative to the committee and attended meetings every six months. We developed a scope of work that brought together the methods we’d been working on over the previous few years, combining approaches used by USGS with those used in Australia.

Are the guidelines equipped for variables such as climate change?

The guidelines are very well suited for detecting trends in climate change, or human impact, if you implement your hydrometric monitoring in a consistent and well documented way. Oftentimes, especially in Australian hydrology, the systems are flashy. You’ll go from extreme wet to extreme dry. There’s a lot of natural variability, which makes quantifying trends in water quality or flow quite difficult when you analyse the data. In hydrology, you often need to analyse data over years to determine whether you’re seeing natural variability or a long-term trend.

Example of suspended-sediment concentration derived from boat-based acoustic doppler measurements. Image courtesy of Daniel Livsey.

How do the guidelines assist in consistent measuring?

Most measurements we take in hydrology are indirect measurements. For example, you put an optical sensor in the water, it flashes a light and receives light back, which estimates the amount of sediment concentration in the water column. These indirect measurements are estimates, so we can get continuous monitoring measurements.

The guideline presents nationally consistent methods for using Acoustic Doppler Velocity Meters (ADVMs) to estimate suspended-sediment concentration and load from acoustic backscatter measurements. The guideline accounts for site selection, instrument selection, maintenance and instillation, as well as a guide for data processing, analysis and collection. Unlike direct measurements, where you can grab a sample and analyse it, the indirect measurements allow for a better analysis of trends in the environment.

The guidelines will be reviewed every five years and have 12 sections written so far. As time goes on and technology evolves, additional sections may be developed to ensure uncertainty in measurements continues to be documented. The committee will meet and review the guidelines accordingly.

What are you hoping your experience and research brings to ATC?

I think there’s a lot of real-time monitoring for Trigger Action Response Plans (TARPs) that could use sensors and machine learning (ML) algorithms to reduce monitoring costs. Through my research, I’ve implemented machine learning algorithms or prediction of real-time time series using distributed sensor networks. You can take rainfall sensors and enter that data through an ML algorithm to predict flow in a river, and we found that we can actually predict flow simply from these rainfall sensor networks. The combination of real-time forecasting and flexible ML algorithms means you can predict and forecast various hydrologic timeseries. I’m excited to explore these possibilities on our sites.

Machine Learning Predictions of Flow and Sediment. Image courtesy of Livsey et al AHA 2023.

I’m also excited about the work Joel and Phil are doing on erosion testing for mine closure cover system design and their flume testing. For closure studies and design, it’s really critical that you have robust erosion measurements, because predicting erodibility from soil measurements alone is fraught with a lot of uncertainty when you don’t have direct erosion measurements. Those direct measurements are really intriguing to me.

Soil erodibility measurements provide a lot of opportunities for research, particularly around how soil erodibility interacts with vegetation cover. There’s also more work to be done in terms of understating the impact of vegetation, it’s interactions with climate and its final interactions with long-term closure landform stability. I definitely think there’s beneficial research that can be applied for our clients to reduce erosion on their closure land forms.

Connect with Daniel on LinkedIn.

Read the new National Hydrometric Monitoring Guidelines.

— Client Log In

Click below to login to our ITransfer Portal.

This website collects cookies to deliver better user experience.

For more information, please read our Privacy Statement