Mangoola Coal Operations Pty Ltd
LOCATION
Wybong, NSW
Mangoola Coal Operations, located in the Hunter Valley, is a major open-cut mining operation committed to responsible resource management and progressive rehabilitation. As part of its closure planning, the site required a comprehensive capping solution for two decommissioned tailings dams: TD1, with a capacity of 3,400 ML, and TD2, with a capacity of 3,900 ML. The Stage 2 capping works covered an area of approximately 222,000 m2.
Closure and Rehabilitation, Construction Support and Management, Dams Engineering, Geotechnical Investigation, Materials Characterisation, Tailings Management, Water Resources
Australia/New Zealand
CLIENT
AGL Macquarie
LOCATION
NSW
ATC Williams (ATCW) has supported ash management and rehabilitation planning at Bayswater Power Station since 2020, delivering ash reconciliation, storage capacity assessments, geotechnical investigations, landform design and long-term rehabilitation strategies. As part of the planned closure of the power station in 2033, AGL Macquarie engaged ATCW to develop a practical, cost-effective strategy for rehabilitating Ravensworth Void 4 and Void 5.
Closure and Rehabilitation, Geotechnical Investigation, Materials Characterisation, Tailings Management
Australia/New Zealand
CLIENT
Glencore
LOCATION
Ravensworth, NSW
Glencore engaged ATC Williams to deliver the geotechnical investigation, detailed design and construction support for closure of the Dam 7 South Tailings Storage Facility (TSF) at Ravensworth Operations in the Hunter Valley, New South Wales. The project required an engineered capping platform over an extremely low-strength in-pit coal tailings deposit, enabling future overburden emplacement under the site’s closure strategy.
Closure and Rehabilitation, Tailings Management
Australia/New Zealand
CLIENT
Yancoal
LOCATION
Hunter Valley, NSW
ATC Williams has supported TD2 throughout almost its entire operational life, first becoming involved at Mount Thorley Warkworth in 1999. Each investigation and design builds on previous monitoring, geotechnical assessments and operational experience, so strategies can be refined as tailings conditions evolve.
Closure and Rehabilitation, Dams Engineering, Geotechnical Investigation, Tailings Management
Australia/New Zealand
CLIENT
MMG Limited
LOCATION
Tasmania
The Rosebery Mine is an underground polymetallic base metal mine located in the township of Rosebery in Tasmania, Australia, and has been in continuous operation for over 85 years. ATC Williams has been working with MMG to deliver Tailings storage solutions since 2005.
Dams Engineering, Engineer of Record, Geotechnical Investigation, Materials Characterisation, Numerical Modelling, Tailings Management
Australia/New Zealand
CLIENT
Toowoomba Regional Council
LOCATION
Queensland
In December 2018, ATC Williams won a tender to assist Toowoomba Regional Council (TRC) with the design and construction of 11 transfer stations across the Toowoomba region as part of the TRC Waste Infrastructure Plan.
Waste & Resource Recovery
Australia/New Zealand
CLIENT
Southern Downs Regional Council
LOCATION
Queensland
In early 2020, Southern Downs Regional Council engaged ATC Williams to assess the suitability of long-haul waste transfer from Stanthorpe.
Waste & Resource Recovery
Australia/New Zealand
CLIENT
Toowoomba Regional Council
LOCATION
Queensland
In December 2018, ATC Williams won a tender to assist Toowoomba Regional Council (TRC) with the design and construction of 11 transfer stations across the Toowoomba region as part of the TRC Waste Infrastructure Plan.
Waste & Resource Recovery
Australia/New Zealand
CLIENT
Noosa Shire Council
LOCATION
Queensland
ATC Williams undertook Landfill Master planning, Cell Vertical Expansion and Capping Detailed Design and Construction Quality Assurance.
Waste & Resource Recovery
Australia/New Zealand
CLIENT
Toowoomba Regional Council
LOCATION
Queensland
In December 2018, ATC Williams won a tender to assist Toowoomba Regional Council (TRC) with the design and construction of 11 transfer stations across the Toowoomba region as part of the TRC Waste Infrastructure Plan.
Waste & Resource Recovery
Australia/New Zealand

— Client Log In

Click below to login to our ITransfer Portal.

This website collects cookies to deliver better user experience.

For more information, please read our Privacy Statement