Geotechnical Investigation and Laboratory Testing
The Mount Rawdon Gold Mine is located approximately 14km southeast of the township of Mount Perry, southwest of Bundaberg in South East Queensland. The Mt Rawdon Operations (MRO) Tailings Storage Facility (TSF) is situated 1.3 km northwest of the Mt Rawdon orebody, adjacent to and directly northwest of the plant area. This storage is used primarily for tailings deposition, with minor inclusions of acid waste rock material.
The TSF comprises a valley-type storage, formed by three embankments:
Stormwater inflows are limited to the TSF surface area, plus a minor catchment to the west. Water accumulating in the TSF (either tailings supernatant or stormwater) is recovered from the storage for process makeup use.
The TSF development has occurred over several construction campaigns, with ATC Williams being involved since the inception of the mine back in 2000.
The latest geotechnical investigation undertaken at the MRO TSF was carried out between May to June 2021. The CPTu data was analysed to estimate the engineering parameters of in-situ tailings to support a Life of Mine (LoM) raise. Specific engineering variables were analysed and presented as profiles against depth using published correlations. In addition to the engineering properties analysis, a liquefaction potential assessment was undertaken to determine the tailings profiles’ susceptibility to flow and cyclic liquefaction.
The outcome of the investigation was successfully able to:
ATC Williams Laboratory Involvement
Representative samples were collected during the investigation and tested in-house at our Melbourne-based NATA accredited laboratory.
Testing was conducted to determine the material parameters and Critical State Line (CSL), helping to determine the materials’ susceptibility to liquefaction.
A primary focus was on deriving the CSL; since the CSL changes with particle size distribution (PSD), samples were tested with varying Soil Behaviour Types (Ic). As part of the testing program, six isotropically consolidated drained/undrained and two anisotropically consolidated undrained monotonic triaxial tests were performed on the tailings to determine the two CSLs.
The laboratory testing program was successfully able to identify the CSL of the tailings material from the samples retrieved on site. Classifying the material as primarily contractive behaviour.
Construction Support and Supervision (QC related)
The QC objectives for the Mount Rawdon TSF construction raises were to confirm the suitability of the material used in construction and of the construction methods adopted in relation to the Specification.
ATC Williams undertook periodic site visits during the construction of the raise on behalf of the Principal. The purpose of these visits was to inspect critical construction activities and to review the construction methodologies and QA procedures to ensure compliance with the general intent of the construction specification.
The main components of the QC program were as follows:
Conclusion
Based on the QA documentation, construction works to form the Mt Rawdon lifts were considered to have been carried out in accordance with the Specifications and acceptable engineering practice. The successful construction support/supervision documentation and site inspections provide evidence that the design assumptions were suitable and, as a result, the appropriate performance of the works in terms of geotechnical integrity should be achievable, subject to the proper operation of the facility.
A field-testing program that included:
A laboratory testing program that included: