Facility Closure

Facility Closure is a critical phase of any mining or resource project, whether it be a mine tailings dam, waste rock dump, water management structure or solid waste landfill. Our approach to closure takes a holistic cradle-to-grave view of the facility, aligning the facility design approach to post-closure performance outcomes centred around cost-efficiency, safety and environmental sustainability.

— Our Expertise

The ATC Williams approach to ‘Facility Closure’ focuses on tangible and effective outcomes. When a landform reaches the end of its useful life, the critical decommissioning phase involves a closure strategy that reduces risk to the owner. Timely attention to closure and a cost-effective closure approach combine to reduce holding costs and financial assurance liability.

Our primary service offerings in closure and rehabilitation include:

  • Planning for closure, initiated at the outset or at any project stage
  • Geochemical characterisation of waste materials, particularly mineralised mine tailings or waste rock
  • Risk assessment as a basis for planning and design to achieve a safe and long term sustainable outcome
  • Design of closure capping systems, specialising in capping across soft tailings and other compressible substrate (including landfills)
  • Regulator referrals and approvals
  • Construction support and performance monitoring of closure works

— INTEGRATED LIFECYCLE CAPABILITIES

Our facility closure practice draws on the expertise across all service areas.

  • Closure by ATC Williams forms an integral part of our tailings management, water management and waste management services, whereby end-of-life decommissioning and closure forms part of the overall design project.
  • Our ground engineering and material characterisation expertise contributes to creation of practical solutions that maximise the use of local construction material resources and where possible integration into any related site activity, thereby reducing overall cost.
Our specialist capability in facility closure is headlined by the breadth of experience in capping of tailings dams and highlights the combined expertise of our tailings management, ground engineering and material characteristics practices. The mining industry has long acknowledged the closure, capping and rehabilitation of tailings deposits as being problematic. 
For more than 20 years and across over 50 projects, ATC Williams has assisted clients in designing systems for the safe future placement of capping fill materials at minimum cost and minimum environmental exposure.

— Partnership Focused

ATC Williams’ values drive us to achieve outcomes that uphold the reputation and minimise the financial exposure of our clients.

We therefore partner with our clients to understand specific needs for facility closure and to achieve effective outcomes, drawing on the range of technical skills and experience available to the business.

— MORE INFORMATION

Please explore our Service Area factsheets to learn more.

— Let's Talk

Connect with an expert today:

— Projects

Discover our extensive facility closure solutions for mining, resources and government projects around the world.

CLIENT
Yancoal
LOCATION
Hunter Valley, NSW
ATC Williams has supported TD2 throughout almost its entire operational life, first becoming involved at Mount Thorley Warkworth in 1999. Each investigation and design builds on previous monitoring, geotechnical assessments and operational experience, so strategies can be refined as tailings conditions evolve.
Closure and Rehabilitation, Dams Engineering, Geotechnical Investigation, Tailings Management
Australia/New Zealand
CLIENT
AGL Macquarie
LOCATION
NSW
ATC Williams (ATCW) has supported ash management and rehabilitation planning at Bayswater Power Station since 2020, delivering ash reconciliation, storage capacity assessments, geotechnical investigations, landform design and long-term rehabilitation strategies. As part of the planned closure of the power station in 2033, AGL Macquarie engaged ATCW to develop a practical, cost-effective strategy for rehabilitating Ravensworth Void 4 and Void 5.
Closure and Rehabilitation, Geotechnical Investigation, Materials Characterisation, Tailings Management
Australia/New Zealand
CLIENT
Mangoola Coal Operations Pty Ltd
LOCATION
Wybong, NSW
Mangoola Coal Operations, located in the Hunter Valley, is a major open-cut mining operation committed to responsible resource management and progressive rehabilitation. As part of its closure planning, the site required a comprehensive capping solution for two decommissioned tailings dams: TD1, with a capacity of 3,400 ML, and TD2, with a capacity of 3,900 ML. The Stage 2 capping works covered an area of approximately 222,000 m2.
Closure and Rehabilitation, Construction Support and Management, Dams Engineering, Geotechnical Investigation, Materials Characterisation, Tailings Management, Water Resources
Australia/New Zealand
CLIENT
Rio Tinto
LOCATION
Northern Queensland
A detailed design for the decommissioning of two Tailings Storage Facilities no longer operational (estimated combined area of 150ha) at the Rio Tinto East Weipa bauxite mining operations located in northern Queensland.
Closure and Rehabilitation, Tailings Management
Australia/New Zealand

— Client Log In

Click below to login to our ITransfer Portal.

This website collects cookies to deliver better user experience.

For more information, please read our Privacy Statement